Kits VCU108 Next Steps

Introduction: This page is intended to guide you through getting familiar with your VCU108 Evaluation Kit. Once you have completed these steps, you will be ready to start creating, implementing and testing your own target design. You should have already completed the VCU108 Quick Start Guide.

Table of Contents

Step 1: Complete the Board Interface Test

The next step after completing the VCU108 Quick Start Guide is to connect the loopback boards & cables provided in the VCU108 kit and test the external board interfaces. Once you have all the loopback boards and cables attached, you will run the Board Interface Test located in the Documentation and Design tab of the VCU108 product page.

Step 2: Explore other Design Examples

Once you have completed the Board Interface Test explore other Design Examples located in the Documentation and Design tab of the VCU108 product page.

Step 3: Create your own Target Design

Now it's time to create your own target design using the Vivado Design Tools.

Related Links

© Copyright 2019 - 2022 Xilinx Inc. Privacy Policy